Distribution center Krostitz

A modern logistics center with three flexible units was completed north of Leipzig in Krostitz, built in roughly six months. The LIGNA systems timber roof structure spans the approximately 292,800 sq ft of floor area. High prefabrication and fast assembly were key to meeting the ambitious schedule.

  • Location Krostitz, Germany
  • Owner EQT Real Estate
  • General contractor Fabrikon
  • Hall area 292,781 sq ft
  • Stored CO₂ ≈ 900 t CO₂