You want to build large halls in timber. Then we are your structural partner.
As an engineering firm with our own production, we deliver the complete structure as a kit, including structural calculations to Eurocode and all connectors. You erect and close in the hall. For commercial buildings from 1,000 m².
What we deliver
The complete structure, from one source.
We only plan and calculate what we actually deliver. That way the responsibilities are clear.
LIGNA systems delivers
You, the timber contractor
Planning
Structural calculations to Eurocode
Execution and assembly drawings (PDF, DWG, IFC)
Structure & steel
Columns, matched to the load case
Girders: frame, truss or solid web
Purlins and rails
Steel parts and all connectors, hot-dip galvanized
Column bases for the foundation connection
Integrated in the timber · as required
Intermediate floors and mezzanines
Crane runway beams in timber
Staircase and elevator shaft
Substructure for facade and reveals
Provided by you
Assembly and erection
Foundation and footings
Building envelope and facade
Roof covering
Binding fixed offer
One kit, one fixed price. We carry the calculation risk.
Our offer is binding. What we quote is what applies.
Planning & structural design
Planned and calculated in-house.
We calculate the structure to Eurocode and design it fully in a 3D model, from the structural design to the CNC timber cutting. You receive position, timber, shop, execution and assembly drawings as PDF, DWG/DXF or IFC. We plan in Cadwork, and on request you receive the model for your roofing and fit-out planning.
Cadwork
continuous 3D model, available on request for your further planning
Eurocode
structural calculations
Our production
Manufactured in our own plant
CNC timber cutting straight from the 3D model, every component numbered and labelled
Steel construction to EN 1090, execution class EXC3
TÜV Rheinland confirms the CE conformity of our factory production control to EN 1090-1 and the welding qualification to EN 1090-2 up to execution class EXC3.
Bonding approval for load-bearing timber components (DIN 1052-10)
The Materialprüfungsanstalt Universität Stuttgart certifies our suitability for bonding load-bearing timber components to DIN 1052-10:2012. A certificate of conformity exists for bonded composite components made of glued laminated timber.
HIGH-TECH-ABBUND association
As a member of the HIGH-TECH-ABBUND association we produce dovetail connections for load-bearing timber components under building authority approval, CNC-milled to the millimetre.
With our digitalized logistics, we always have full visibility of your delivery status: every package is planned and packed according to your assembly sequence, and every component is tracked by barcode from the plant gate to unloading.
just-in-time
in your assembly sequence
Barcode
from the plant gate to unloading
Assembly
You handle assembly. On request, we are there with you.
On request, an experienced assembly supervisor from LIGNA systems accompanies the start of your assembly or supports you during the first days on site.
What wood construction firms want to know before requesting a quote.
What is included in the timber hall kit?
The complete structure: column bases, columns, girders, purlins, rails and bracing in glulam, plus intermediate floors, crane runway beams and substructures as required, all steel parts and connectors, as well as the structural calculations and all drawings. Delivered at a fixed price. Foundation and footings, building envelope, roof covering with its certifications, and assembly remain your responsibility.
Who carries the calculation risk?
We do, based on the agreed load assumptions. You receive a binding fixed offer; the risk of correctly calculating quantities and structural design for the stated loads lies with LIGNA systems, not with you. You specify the use loads, for example for intermediate floors and the roof build-up, as well as the location for snow and wind load. The fixed price applies on this basis. If these assumptions change later, we adjust the structure and offer transparently.
Do you provide structural calculations that can be submitted for approval?
In Germany, we provide structural calculations to Eurocode formatted for submission with the building permit application; in other countries, we provide structural calculations to Eurocode. The official review of the structural safety documentation follows the relevant national building code and is commissioned by the permit applicant. If the official review requires adjustments to our calculations, we carry out the adjustment.
How does the structure connect to the foundation?
The hot-dip galvanized steel column bases are rigidly connected to the timber columns; we supply the structural verification of the timber-to-steel and steel-to-steel connections. For the foundation, you receive the characteristic column loads as well as the position and diameter of the steel anchors as a planning basis. Two approaches are common: cast-in steel anchors, designed by the project's structural engineer, or a point foundation with threaded rods and grout provided on site. Sizing and anchoring in the concrete, as well as column impact protection, remain your responsibility.
What fire resistance does the structure achieve?
R30 (30-minute fire resistance) is standard. Up to R60 can be achieved cost-effectively through the structurally required cross-section, to Eurocode. The achievable class depends on cross-section, load pattern and cladding; the case-by-case verification is what governs.
How is the kit delivered?
Every component is tracked by barcode and loaded in your assembly sequence. Within Europe, we deliver directly to the job site; worldwide, as container shipments.
Do you assemble the structure yourselves?
No, with the kit you carry out the assembly yourself. Dovetail joints and pre-drilled bolting points, along with numbered parts referenced in the assembly drawings, make assembly unambiguous.
Do you support the assembly?
On request, an experienced assembly supervisor can accompany your assembly or support you during the first days at the start of assembly.